Demolition of Existing Pier

Scanning the Seabed

Precast Block Works

Scaffolding 5 m wide and 55 m long.

  • Location
    Thomas Bay Malta
  • Duration
    02.06.2020 - 14 Month
  • Status
    Completed
  • Construction Area
    -
  • Client
    Ministry of Infrastructure Malta