The project includes the construction of a new Cargo Facility at Ras Hanzir in the Grand Harbor of Valletta Port, Malta. This facility will be located between the Laboratory Pier and the Fuel Pier. The new dock will be parallel and aligned with the existing Fuel Wharf Dock, but will slide offshore. Construction will be predominantly above water and will consist of:

Cleaning, excavation and demolition

Dock retaining wall structure (special structures) built in stages, including mooring facilities

Seabed consolidation/Soil remediation, land reclamation and paving works

Laying and preparation of services

Buildings, gates, fences and barriers

  • Location
    Corradino, Paola, Malta
  • Duration
    110 Hafta (2023-2025)
  • Status
    Ongoing
  • Construction Area
    28.300 m2
  • Client
    Ministry of infrastructure Malta