Project; It includes the repair and improvement of severely damaged units, moderately damaged units, segregated concrete, damaged utility entrances, layer surfaces, and the application of a protective layer to rubber roofing. Fittings and crack repair were also included in the scope of work. The project was carried out only under System management

  • Location
    Tripoli-Libya
  • Duration
    36 Month
  • Status
    Completed
  • Construction Area
    50.000,00 Sqm
  • Client
    Gsplaj Social Security Fund