The project consists of repairing the damaged reinforced concrete structure of the bulk cargo mooring by removing and replacing harmful piles at the bulk cargo mooring site. The project was carried out only by System management.

  • Location
    Misurata - Libya
  • Duration
    12.2003 – 02.2004 (3 month)
  • Status
    Completed
  • Construction Area
    -
  • Client
    Libyan Iron and Steel Company