* System Construction Areas of Responsibility;

-Mercury Tower Phase-1 Construction Management

-Mercury Tower Phase-2 Construction Management

-Mercury Tower Phase-1 Exterior Works

-Mercury Tower Phase-1 Fine Works

-Mercury Tower Phase-2 Fine Works

* Field of Application Current Scope

*Phase 1:

Construction Area: 70.000 m²

7 basements, 1 square, 34 floors, 253 flats

*Phase 2:

Construction Area: 50.000 m²

-Residence Building: 7 basements, 1 square, 10 floors, 167 flats.

-Hotel Building: 7 basements, 1 square, 19 floors.

  • Location
    St.Julians – Malta
  • Duration
    July 2019 - December 2020 - 18 Months
  • Status
    Ongoing
  • Construction Area
    50.000 m²
  • Client
    Mercury Taahhüt Projeleri Ltd.