Project; consists of all civil, electrical, mechanical, landscaping and infrastructure works. Design projects were also implemented by our company.

1 main restaurant (1,319 m²),

1 event area, (925 m²),

1 internet cafe (722 m²),

1 amphitheater (236 m²),

2 cafes (200 m² each),

Outdoor sports fields - 2 football fields (930 m² each),

1 basketball – volleyball court (510 m²),

Ornamental fountain with fountain (2010 m²),

Ponds (125 m², 90 m²),

Water elements (1.550 m², 2.500 m²),

3 children's playgrounds (total area 450 m²),

There is an outdoor sports area (total area 400 m²) and at the same time

2.000 m² twinson decking flooring for landscape areas,

  14.000 m² of interlock stone,

  11.000 m² stamp concrete,

11.000 m² asphalt,

1.000 m3 gravel,

1.000 m3 epdm,

2.000 m² artificial grass,

70,000 m² of grass was used and

A total of 600 m2 tent area has been used

3.000 m² of natural stone was used in the cladding of the exterior walls.

10,000 m² of marble is used for both wall and floor covering

6.000 m² granite was used in the floor covering

1,318 palm trees and 16,500 m² of dwarf trees were planted.

  • Location
    Tripoli - Libya
  • Duration
    26.08.2008 - 01.09.2009 (13 month)
  • Status
    Completed
  • Construction Area
    195.000 m²
  • Client
    ODAC - Organization For Development Of Administrative Centers