This project consists of a lounge and restaurant with a capacity of 1000 guests.

The main structure of the single-storey lounge building is reinforced concrete and the roof is steel construction. The façade is double coated and the inside is glass and the outside is granite. The VIP suite is also included in the business scope.

Project; consists of all civil, mechanical, electrical, infrastructure and landscaping works.

  • Location
    Sirt, Libya
  • Duration
    15.05.2010 - 15.10.2010 (5 ay)
  • Status
    Completed
  • Construction Area
    10.414 m²
  • Client
    ODAC - Organization For Development Of Administrative Centers