It is the air tunnel laboratory building of the faculty of aviation. The main structure is galvanized steel frame. There are office, laboratory and classroom sections. Design projects were also made by our company.

  • Location
    Miscellaneous Places in Libya
  • Duration
    24.03.2010 – 28.02.2011 (11 month)
  • Status
    Completed
  • Construction Area
    1.200 m²
  • Client
    ODAC - Organization For Development Of Administrative Centers